California Hydro Excavation

Hydro Excavation & Utility Potholing in California.

Expose existing utilities. Open a targeted excavation. Prepare for the next phase of underground construction. California Hydro Excavation brings water excavation and vacuum removal together around the needs of your project.

A clearer view of existing utilities helps your team plan the work that follows.
Vacuum excavation hose removing material from a focused excavation beside a paved surface
  • Utility exposure
  • Targeted excavation
  • Hydrovac support
  • Commercial & utility projects
Plan the work around what is already there

Understand the ground before the next phase.

Utility plans and surface markings help guide a project. Exposing a buried line gives your team a direct view of its position and depth at the excavation point.

Hydro excavation uses water to loosen soil and a vacuum system to collect it. The approach is useful for focused excavations, utility crossings and locations where access or nearby infrastructure affects how the work can proceed.

Verify existing utilities

Expose selected locations to check alignment, depth and clearance before construction reaches them.

Define the excavation

Match the working area to the utility exposure, trench or access opening your project requires.

Coordinate the next phase

Use the exposed conditions to help plan drilling, conduit installation, trenching or other site work.

Our services

Hydro Excavation & Utility Exposure Services

Start with what needs to be exposed, excavated or removed. Each service addresses a different part of preparing and working around underground infrastructure.

Water-assisted digging

Hydro Excavation

Water loosens the soil while vacuum equipment collects the excavated material. This method supports targeted digging near existing infrastructure, with the approach matched to utility conditions, soil characteristics and site access.

Service details
Narrow excavation routes

Slot Trenching

Create a narrow excavation for selected conduit and utility routes. Trench width, depth and alignment depend on the installation requirements, surface conditions and infrastructure already within the proposed route.

Service details
Truck & vacuum support

Hydrovac

Truck-mounted water, vacuum and debris collection systems support excavation and material removal. Planning includes truck positioning, hose access, water supply and handling the collected soil and slurry.

Service details
Test holes & verification

Utility Potholing

Expose selected utility locations before drilling, trenching or construction. A focused test hole lets the project team check a line's position and depth where a crossing or potential conflict needs verification.

Service details
Visible utility access

Daylighting

Uncover buried pipes, cables and conduit for inspection or construction coordination. Exposing a section of infrastructure helps your team assess its visible condition, alignment and surrounding clearance.

Service details
Choose the service that fits

What does your project need?

Describe the work and the area that needs attention. These common project needs are a useful place to start.

How hydro excavation works

Water loosens the soil. Vacuum equipment removes it.

The excavation method and equipment setup depend on the work area, ground conditions and existing utilities. Preparing those details helps define the scope before equipment arrives.

Utility marking, appropriate excavation practices and coordination with the project team remain part of planning the work.
  1. Loosen the soil

    A water stream breaks up soil within the working area. Pressure and technique must suit the ground and nearby infrastructure.

  2. Collect the excavated material

    A vacuum hose draws loosened soil and water into a debris tank. Equipment access and material handling are considered as part of the job.

  3. Review the exposed conditions

    The project team can check utility depth, alignment and clearance at the exposed location before planning the next construction step.

Commercial & underground construction

Plan utility exposure around the larger project.

Existing lines can affect where a new conduit, foundation or service connection will go. Share the proposed work and the locations where underground conditions need a closer look.

We review project inquiries with the construction sequence, access requirements and excavation scope in mind.

Fiber & conduit routes

Check existing utilities at proposed crossings, entry points and installation routes.

EV charging & electrical

Expose infrastructure near planned power routes, equipment areas and service connections.

Commercial solar

Review utility conflicts where proposed electrical routes meet existing site infrastructure.

Site improvements

Investigate selected locations before trenching, foundations or other excavation begins.

Request a project quote

Start with your site and the work that needs to happen.

Plans, marked-up drawings and site photos help explain the job. Include the excavation locations, expected dimensions and schedule so we can discuss the scope and availability.

Project location

Site address, work area, truck access and any restrictions on equipment positioning.

Excavation requirements

Utility type, number of locations, expected depth and proposed trench or opening dimensions.

Ground & surface conditions

Known soil conditions, paving, landscaping and any surface removal or restoration needs.

Schedule & coordination

Requested dates, site contact, available plans and the construction activities that follow.

Common questions

Planning hydro excavation work

Are hydro excavation and hydrovac the same?

The terms overlap. Hydro excavation describes the method of loosening soil with water and removing it with a vacuum. Hydrovac generally refers to the equipment and service that combine water excavation, vacuum removal and debris collection.

What is the difference between potholing and daylighting?

Both involve exposing buried utilities. Potholing usually creates a focused test hole to verify a line at a specific point. Daylighting may expose a longer section so the project team can inspect it or coordinate nearby construction.

Can hydro excavation be used for every trench?

The right method depends on the trench dimensions, soil and surface conditions, nearby infrastructure and installation requirements. Hydro excavation can suit targeted or narrow excavations. Other scopes may require a different method or a combination of approaches.

What affects the price of hydro excavation?

Project location, excavation dimensions, soil and surface conditions, access, utility congestion, material handling and scheduling all help define the scope. Send the available plans and site details so the work can be reviewed.

California Hydro Excavation

Tell us what needs to be exposed.

Share your plans or describe the work. We will discuss the excavation requirements, project location and next steps.

Request a Quote